Full Description
DRIVE BASE ASSEMBLY- Assembly consists of Fabrication, Hydraulic and Electrical components as per drawing package P/N# 4265AS1000. Following Task must be performed by Supplier (Assembler) 1) Assembly should be built as per Drawing Package PN# 4265AS1000 provided by Testek. 2) All components must be purchased by Supplier (Assembler) based on BOM provided by Testek. 3) If the Supplier feels that the component from the bill of material cannot be procured from the market, those components will be provided by Testek upon request from Supplier. 4) If the parts which are in the bill of material and they have become obsolete from the market, alternative parts for the same part will be procured from the supplier. But before use of alternative parts supplier has to ask for permission to use those alternative parts from Testek and it has to be used in the assembly which will be used only after the approval of Testek. 5) All listed below items are provided by Testek to Supplier. Testek must receive all the items at Testek Wixom facility and ship to Supplier once it received allβs. 6) Scope of Supply by Testek: Item # 610.1, 616.1,616.2, 628.1, M11. Apart from this item list if any additional items requested from Testek will be bring to Testek notice and those items cost will be adjusted from Assembly Charges. 7) Prior to shipment Supplier (Assembler) must provide pictures of individual Assembly, QC Test Report and filled ATP which provided by Testek. 8) Filled ATP from Supplier (Assembler) must be Approved by Testek prior to shipment of Assembly.